Mr. John.zhou

What can I do for you?

Mr. John.zhou

What can I do for you?

Wuxi IDO Technology CO.,LTD
HomeProductsWashing MachineFront-Loading Drum Automation&Assembly LineTripod and upper and lower flange preinstalled

Tripod and upper and lower flange preinstalled

Payment Type:
L/C,T/T,D/P
Incoterm:
FOB
Min. Order:
1
Transportation:
Ocean
Port:
Shanghai
Share:
  • Product Description
Overview
Product Attributes

BrandIDO

CertificationISO

AutomationAutomation

Flexible ProductionIntelligent Manufacturing

Supply Ability & Additional Information

Packagingwooden box

TransportationOcean

Place of OriginCHINA

CertificateISO9001:2015

PortShanghai

Payment TypeL/C,T/T,D/P

IncotermFOB

Packaging & Delivery
Package Type:
wooden box

Tripod and upper and lower flange preinstalled

Production Description

1、Tripod and upper and lower flanges are pre-installed as single machine equipment, including;Feeding station, riveting station and feeding storage station;

2、Tripod and upper and lower flange with rely on artificial to a tripod and lower flange, rivets, washers, drum circles, such as the flanges according to the technological requirements placed on the workstation can exit action area and start the equipment, by preloading device will be under the tripod and the flange clamp, a riveting station out of riveting, after the completion of the tooling automatically rotate 120 °, riveting station again out of riveting, tooling to rotate 120 °, again out of riveting riveting station last time;After completion, the tooling will run to the next station;Manually remove the workpiece.The pre-installed tripod and lower flange should be ensured that the tensile test after riveting meets the technical requirements. The upper flange and barrel ring should be fixed by pressure riveting;

Production Description


Automatic Production Line Customized Equipment List
Project Name: Automatic Production Line For 56L WM Drum
PARTS Equipment QTY Demands
Common punch line Automatic Loading 1 Compatible with 54\ 56L, reserve 64L material specification
Uncoiler Levellering  Machine 1
Servo Feeder 1
Punching Machine 1 Compatible with 54\ 56L, reserve 64L die size
54L Stamping die 1 New-Made
Transfer Feeder Machine 1 Compatible with 54\ 56L two separated line
Buckle riveting Extruded Processing Line Three-axis Rolling Machine 1 Produce 54L
Extruded Flanging Machine 1
Flange&Tripod Preassemble Pressing Rivet Machine 1
Front&Back Flange Whirling Machine 1
Welding Processing Line Welding Machine 1 Produce 54L Compatible & reserve 64L Production
Erikson Detector Machine 1
Flanging Machine 1
Front&Back Flange Whirling Machine 1
Drum&Tripod Assemble  Machine 1
Tripod Preassemble&Flanging  Machine 1
Tripod Fastening Tooling Machine 1
Fixed Twist Tool Gun 2 Desoutter / Atlas Welding Brand
Common Testing Dimensional Inspection Tool(Axial's radial runout data) 1 Compatible with 54\ 56L, reserve 64L 
Material: AISI430(1200R),thickness0.5&0.6mm, Coil weight 800kg--1500kg
Cycle Time Line cycle time  35 Seconds/piece, Production cycle time  45 Seconds/piece
Project Delivery Date In August 2016 , the lead time is 5 months



Production Detail Show


Squeeze Riveter

Production Line Unit

Production Line Flow 2Production Line Flow 1

Pack And Storage

Packaging Process




Die Partner

Q: Are you a factory or trading company? 
A: We are a factory which has been producing metal stamping moulds for more than 10 years.
Q: Do you accept OEM/ODM?
A: Yes, of course. We can custom make for you based on your drawing or sample
Q: What are your main products?
A: We specialize in designing and manufacturing sheet metal stamping tools/moulds mostly for household appliance and automobile
industry, CNC machining parts and mould supporting facilities etc.
Q: Do you provide samples? Is it free of charge or extra?
A: Yes, we could offer the samples free of charge but do not undertake the cost of freight.
Q: How can I get the quotation?
A: Normally, we can get back to you within 24 hours when getting your detailed 3D drawing and requirements. If the project include
s many different parts, we will try our best to get back asap.In order to quote for you earlier, please provide us the following
information together with your inquiry.
1) 2D and 3D Drawings (DWG, STP, STEP, X_T, IGES, PDF)
2) Material requirement
3) Surface treatment requirement
4) Quantity (per order/per month/annual)
5) Any special demands or requirements, such as packing, labels,delivery,etc.
Q: What is your design software?
A: CAD, CAXA, UG
Q: What's the delivery time?
A: The stamping tool manufacturing cycle is 30-50Days, standard stamping parts is 3 to 10 days after payment. If OEM or make the
tooling, we will confirm the delivery time with you.
Q: What is your term of payment?
A: Payment 50% T/T in advance, balance before shipment.


Product Categories : Washing Machine > Front-Loading Drum Automation&Assembly Line

Email to this supplier
  • *Subject:
  • *To:
    Mr. John.zhou
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
HomeProductsWashing MachineFront-Loading Drum Automation&Assembly LineTripod and upper and lower flange preinstalled
Send Inquiry
*
*

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send