Mr. John.zhou

What can I do for you?

Mr. John.zhou

What can I do for you?

Wuxi IDO Technology CO.,LTD
HomeProductsWashing MachineFront-Loading Drum Automation&Assembly LineArgon arc welding of a coil

Argon arc welding of a coil

Payment Type:
L/C,T/T,D/P
Incoterm:
FOB
Min. Order:
1
Transportation:
Ocean
Port:
Shanghai
Share:
  • Product Description
Overview
Product Attributes

BrandIDO

CertificationISO

AutomationAutomation

Flexible ProductionIntelligent Manufacturing

Supply Ability & Additional Information

Packagingwooden box

TransportationOcean

Place of OriginCHINA

CertificateISO9001:2015

PortShanghai

Payment TypeL/C,T/T,D/P

IncotermFOB

Packaging & Delivery
Package Type:
wooden box

Argon arc welding of a coil


Production Description

1、The round tiG arc welding is made of two single machine equipment, including the sheet winding mechanism, automatic welding mechanism and the location of the material receiving warehouse.

2、The coiling mechanism relies on manual operation to put the punch sheet into the coiling platform. Personnel exit the operation area of the equipment and start the equipment. The coiling machine will automatically coiling and manually take out the coiling after the coiling is completed.

3、Argon-arc welding relies on manual placing the butt joint of the round back cylinder into the automatic welding mechanism. Personnel withdraw from the operation area of the equipment and start the equipment. The equipment can be positioned and locked on the machine movement through the fixed mechanism to realize automatic welding.Argon arc welding shall ensure that the tensile test of joints after welding meets the technical requirements.

4、Welding can display the pressure and flow of argon gas. Manual switching function should be set when the operation needs to be switched. When the required resources are insufficient, the machine will automatically alarm and stop.


Production Description

Automatic Production Line Customized Equipment List
Project Name: Automatic Production Line For 56L WM Drum
PARTS Equipment QTY Demands
Common punch line Automatic Loading 1 Compatible with 54\ 56L, reserve 64L material specification
Uncoiler Levellering  Machine 1
Servo Feeder 1
Punching Machine 1 Compatible with 54\ 56L, reserve 64L die size
54L Stamping die 1 New-Made
Transfer Feeder Machine 1 Compatible with 54\ 56L two separated line
Buckle riveting Extruded Processing Line Three-axis Rolling Machine 1 Produce 54L
Extruded Flanging Machine 1
Flange&Tripod Preassemble Pressing Rivet Machine 1
Front&Back Flange Whirling Machine 1
Welding Processing Line Welding Machine 1 Produce 54L Compatible & reserve 64L Production
Erikson Detector Machine 1
Flanging Machine 1
Front&Back Flange Whirling Machine 1
Drum&Tripod Assemble  Machine 1
Tripod Preassemble&Flanging  Machine 1
Tripod Fastening Tooling Machine 1
Fixed Twist Tool Gun 2 Desoutter / Atlas Welding Brand
Common Testing Dimensional Inspection Tool(Axial's radial runout data) 1 Compatible with 54\ 56L, reserve 64L 
Material: AISI430(1200R),thickness0.5&0.6mm, Coil weight 800kg--1500kg
Cycle Time Line cycle time  35 Seconds/piece, Production cycle time  45 Seconds/piece
Project Delivery Date In August 2016 , the lead time is 5 months
Production Line Site 1


Production Detail Show

Special Welding Machine

Production Line Flow 2Production Line Flow 1

Pack And Storage

Packaging Process




Die Partner

Q: Are you a factory or trading company? 
A: We are a factory which has been producing metal stamping moulds for more than 10 years.
Q: Do you accept OEM/ODM?
A: Yes, of course. We can custom make for you based on your drawing or sample
Q: What are your main products?
A: We specialize in designing and manufacturing sheet metal stamping tools/moulds mostly for household appliance and automobile
industry, CNC machining parts and mould supporting facilities etc.
Q: Do you provide samples? Is it free of charge or extra?
A: Yes, we could offer the samples free of charge but do not undertake the cost of freight.
Q: How can I get the quotation?
A: Normally, we can get back to you within 24 hours when getting your detailed 3D drawing and requirements. If the project include
s many different parts, we will try our best to get back asap.In order to quote for you earlier, please provide us the following
information together with your inquiry.
1) 2D and 3D Drawings (DWG, STP, STEP, X_T, IGES, PDF)
2) Material requirement
3) Surface treatment requirement
4) Quantity (per order/per month/annual)
5) Any special demands or requirements, such as packing, labels,delivery,etc.
Q: What is your design software?
A: CAD, CAXA, UG
Q: What's the delivery time?
A: The stamping tool manufacturing cycle is 30-50Days, standard stamping parts is 3 to 10 days after payment. If OEM or make the
tooling, we will confirm the delivery time with you.
Q: What is your term of payment?
A: Payment 50% T/T in advance, balance before shipment.


Product Categories : Washing Machine > Front-Loading Drum Automation&Assembly Line

Email to this supplier
  • *Subject:
  • *To:
    Mr. John.zhou
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
HomeProductsWashing MachineFront-Loading Drum Automation&Assembly LineArgon arc welding of a coil
Send Inquiry
*
*

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send